Sources & Evidence
This public source library gathers the legal, data, media, and official-government references behind the Protect30A stormwater plan so readers can check the claims for themselves.
Primary references behind the stormwater plan.
These are not a substitute for official county records or legal advice. They are a clear index of the sources Protect30A uses when explaining the plan in plain language.
November 4 correction: The January 1 collection-method deadline has a statutory March 1 agreement option. Stormwater benefit areas may be created alone or in cooperation; grants remain contingent. Older review dates below are retained where no new source examination occurred.
| Claim or topic | Source | Date checked | Status | Plain-English note |
|---|---|---|---|---|
| Walton County MS4 accountability | Walton County stormwater: evidence and original sources | November 4, 2026 | Examined report; index metadata; open questions | County report content and DEP index metadata have different evidence limits. Posted reports do not establish DEP receipt or current compliance. Findings and cutoffs · Requests · Corrections. |
| County authority to create MSBUs for local public improvements | Florida Statutes § 125.01 | July 2, 2026 | Primary law | Supports the explanation that a county can create a benefit unit without forming a new government body. |
| Uniform collection method: standard deadline and agreement option | 2026 Florida Statutes § 197.3632(3)(a) | November 4, 2026 | Primary law; wording corrected | The first-use resolution normally precedes January 1. Adoption before March 1 is available if the local government, property appraiser and tax collector agree. Notice and later assessment-roll requirements also apply. The resolution concerns the collection method; it does not guarantee project funding or construction. |
| Stormwater utilities and benefit areas | 2026 Florida Statutes § 403.0893 | November 4, 2026 | Primary law; wording clarified | A county or municipality may create stormwater utilities, dedicate other funds, or create benefit areas alone or through interlocal cooperation. An interlocal agreement is not mandatory for every benefit area. Subarea fees must reasonably relate to differing benefits. This authority does not establish an adopted local program. |
| Interlocal cooperation between public entities | Florida Statutes § 163.01 | July 2, 2026 | Primary law | Relevant to future coordination between local governments or special-purpose entities. |
| Special district accountability framework | Florida Statutes ch. 189 | July 2, 2026 | Primary law | Relevant only to the optional local-control phase described on the homepage. |
| State resilience grant context | Florida DEP Resilient Florida applicant guidance | November 4, 2026 | Official program; dated eligibility context | The 2026 application window ended September 1. DEP identifies implementation funding with fiscal year 2027–28 allocations; selection depends on eligibility, evaluation and available funding. No award to this proposal has been verified. |
| County stormwater program reference | Walton County stormwater management program | July 2, 2026 | Official county | Official county context for stormwater responsibilities and public-program information. |
| Volunteer water-quality monitoring context | Choctawhatchee Basin Alliance | July 2, 2026 | Data partner | Source attribution for the homepage water-quality explorer and long-term dune-lake monitoring discussion. |
Fact, opinion, and advocacy stay labeled.
Protect30A explains the plan from a community-advocacy perspective while linking legal and data claims back to original sources.
Flag a source or wording issue.
Email corrections, missing source links, or disputed wording so the public page can be updated with a review note.
Official sources control.
When there is any conflict between Protect30A summaries and official statutes, meeting notices, or agency records, the original source controls.
Community advocacy documents
Direct public records for Raven and Helen McCall Park. PDF file signatures, titles and page counts checked October 16, 2026. These are source records, not endorsements of every claim in an application.
- Raven complete county packet — PDF, 84 pages, about 75 MB. Large download; for a quick read, use the smaller documents below.
- Raven staff report, October 7, 2026 — PDF, 13 pages
- Raven applicant narrative, March 20, 2026 — PDF, 2 pages
- October 7 Technical Review Committee agenda — web page
- Pace laboratory report, Lot ZD17009 — PDF, 31 pages
- April 28, 2026 county minutes — PDF, 18 pages
- June 30, 2026 county minutes — PDF, 17 pages
- Helen McCall turf-versus-grass agenda item and white paper — PDF, 5 pages
- February 26, 2026 county meeting record — web page
- Helen McCall ITB 26-01 — official procurement portal. This is not a direct PDF; attachments may require sign-in. If unavailable, request ITB 26-01 and Addendum 3 from Walton County Purchasing.
- Raven preliminary review — readable web document
- Helen McCall preliminary brief — printable web document
Publication and retrieval audit — November 4, 2026
An AI-assisted review found both websites publicly readable, with existing analytics integration. Targeted search checks did not return the MS4 and research pages in the inspected result sets; this is a retrieval observation, not proof of non-indexing. Visitor counts, referrals and independent AI citation frequency were not obtained.
Download observations and exact queries (JSON) · Read the method and limits
Controlled citation-support test (JSON) · Test method and four answers. Four of four answers matched their selected source pages. The same assistant generated and checked the answers; this does not measure independent AI accuracy or organic citation frequency.